
EXPERTS IN HVAC RETROFIT SOLUTIONS | SINCE 2007
Talk to an HVAC Retrofit Engineer
Planning a retrofit, working around a limited shutdown, or dealing with an urgent fan or AHU failure? Send us the project conditions and a GRR engineer will review the next step.
17+
Years of Experience
10M+
kWh Savings Delivered
1000+
Fan Arrays Installed
0
Unplanned Downtime
Tell us what you’re working on and share whatever project information is available.
You do not need a complete design package to start.
Equipment details, airflow or static-pressure requirements, photos or drawings, controls information, access constraints, shutdown window, and project timing can all help our engineering team understand the situation and define the next practical step.
Then continue with the form below.
What to Send Us
You do not need a complete design package to start.
If available, include:
equipment type / AHU information
required airflow and static pressure
photos or drawings
controls / electrical information
access constraints
operating problem
available shutdown window
project location and timing
Send Project Details

Contact GRR Cooling
Planning a retrofit, working around a limited shutdown, or dealing with an urgent fan or AHU failure?
Send us the project conditions and a GRR engineer will review the next step.
What Happens Next
1 | Engineering Review
Our team reviews your information and evaluates the best approach.
2 | Clarify the Scope
We may follow up with a few questions to confirm details and project goals.
3 | Define the Next Step
We’ll recommend a path forward — quote, site visit, or technical discussion.
What Happens Next
1 | Engineering Review
Our team reviews your information and evaluates the best approach.
>
2 | Clarify the Scope
We may follow up with a few questions to confirm details and project goals.
>
3 | Define the Next Step
We’ll recommend a path forward — quote, site visit, or technical discussion.
Proof From the Field

12,000 CFM | 7-Hour Window
Hospital Return Fan Retrofit for OR Support
Two ECM fans, custom duct transitions, a new control panel, and stable return airflow delivered under active hospital conditions.

30-Ton RTU | 7 Hours Onsite
Live Rooftop HVAC Replacement
Existing equipment removed, curb prepared, new RTU lifted into place, duct transitions fabricated, and the system commissioned within one onsite window.

2-Coil System Rebuilt as 3 Coils
Hospital Chilled-Water Coil Section Retrof
When like-for-like replacement would not fit, GRR redesigned the coil section around actual access, piping, drainage, and service conditions.
Proof From the Field

12,000 CFM | 7-Hour Window
Hospital Return Fan Retrofit for OR Support
Two ECM fans, custom duct transitions, a new control panel, and stable return airflow delivered under active hospital conditions.

30-Ton RTU | 7 Hours Onsite
Live Rooftop HVAC Replacement
Existing equipment removed, curb prepared, new RTU lifted into place, duct transitions fabricated, and the system commissioned within one onsite window.

2-Coil System Rebuilt as 3 Coils
Hospital Chilled-Water Coil Section Retrof
When like-for-like replacement would not fit, GRR redesigned the coil section around actual access, piping, drainage, and service conditions.
